Jekuthiel's Dairy - Picture Journal
Mar 27- Apr 9, 2007...

~*~*~*~*~*~*~

March 27, 2007

Attaching the felt paper.
Attaching the felt paper.
The metal roofing is all on and getting screwed down!
The metal roofing is all on and getting screwed down!

~*~*~*~*~*~*~

March 28, 2007

Daylight shot of the new roof all screwed down.
Daylight shot of the new roof all screwed down.
Side View
Side View
A couple of my younger brothers on the old roof unscrewing screws, so we can start taking off the old roof.
A couple of my younger brothers on the old roof unscrewing screws, so we can start taking off the old roof.
A 1/3 of the old roofing is off! We also have to roll off the old insulation.
A 1/3 of the old roofing is off! We also have to roll off the old insulation.

~*~*~*~*~*~*~

March 29, 2007

All of the old roofing is off and half of the old rafters!
All of the old roofing is off and half of the old rafters!
Close-up
Close-up
Another picture of the front.
Another picture of the front.

~*~*~*~*~*~*~

March 31, 2007

All the roof braces are down and half of the new extended beam is completed! Lights are also reattached to the new roof.
All the roof braces are down and half of the new extended beam is completed! Lights are also reattached to the new roof.
View from the main barn.
View from the main barn.
View from the addition.
View from the addition.

~*~*~*~*~*~*~

April 3, 2007

Interior walls are starting to go up!
Interior walls are starting to go up!
View from the back side (you can see where the window will be in the new milk room).
View from the back side (you can see where the window will be in the new milk room).
Another front view shot.
Another front view shot.

~*~*~*~*~*~*~

April 6, 2007

Forms are up for the porch and new milking parlor, as we will be pouring those floors today!
Forms are up for the porch and new milking parlor, as we will be pouring those floors today!
Dad's finishing the concrete in the new milking parlor and putting in all the angles needed for slope to the drain.
Dad's finishing the concrete in the new milking parlor and putting in all the angles needed for slope to the drain.
View of the porch (the smaller pad in the top left is where the outside fridge will be located).
View of the porch (the smaller pad in the top left is where the outside fridge will be located).

~*~*~*~*~*~*~

April 9, 2007

Plywood is up on most of the outside walls, of the new milk room, and we have a door!
Plywood is up on most of the outside walls, of the new milk room, and we have a door!
Milk Room (left), Milking Parlor (middle) & Storage Area (right).
Milk Room (left), Milking Parlor (middle) & Storage Area (right).
Back side view, of the outside, of the new Milk Room. We have a window now, too!
Back side view, of the outside, of the new Milk Room. We have a window now, too!
The new Milking Parlor, from inside the barn. You can see the drain, in the floor, in this picture.
The new Milking Parlor, from inside the barn. You can see the drain, in the floor, in this picture.

~*~*~*~*~*~*~